8/31/13 First Floor Rebar

Sorry. It’s been a while since we posted construction updates. We’ve been really busy working on the project! So here is an update on what was completed back in August. The rebar was placed for the first floor concrete, and all the electrical conduit was positioned in the floor – almost ready for concrete.

First floor rebar set, electrical conduit installed

First floor rebar

 