4/4/2015 – Progress Report

After a brutally cold winter that never seemed to end, we are finally able to work outside again and finish up the exterior of the Liberties Gateway Building. One sidewalk on Hancock Street has been completed, and the other will soon be done. Hancock Street has been rebuilt, and was recently paved. Paving repairs were done and new curbs were installed on Green Street. We are now installing the balconies, and weather permitting, will finish the other sidewalks as soon as possible. We hope to reopen all the sidewalks in just a few more weeks!

On the interior, the 14 beautiful apartments have been completed and are now leasing! Pictures of these luxury apartments have been posted on this site, along with rental rates and the lease application. The decorative tile floor in the lobby and the elevator has been completed. We hope to have all our approvals by the end of April, and are projecting a move-in date for the apartments of May 1.

The automatic doors have been installed in the new Penn Herb Company store. The concrete floors have been polished, and soon the store fixtures will be installed. Keep checking back for updates!

This slideshow requires JavaScript.



%d bloggers like this: