4/25/2015 – Progress Report

Our sidewalks are finally done! The balconies are done! The parking garage is done! Soon the construction fence will come down and the sidewalks will open!

Leasing of the apartments was accomplished incredibly fast. We have leases pending on 13 of the 14 apartments. Only unit 305 remains as of today – and this is a beautiful apartment. We are sure it won’t last long. The first tenants are scheduled to arrive on May 1.

We will now put our full efforts into completing the new Penn Herb Company store. Check back for updates!

 

This slideshow requires JavaScript.

 

 




4/4/2015 – Progress Report

After a brutally cold winter that never seemed to end, we are finally able to work outside again and finish up the exterior of the Liberties Gateway Building. One sidewalk on Hancock Street has been completed, and the other will soon be done. Hancock Street has been rebuilt, and was recently paved. Paving repairs were done and new curbs were installed on Green Street. We are now installing the balconies, and weather permitting, will finish the other sidewalks as soon as possible. We hope to reopen all the sidewalks in just a few more weeks!

On the interior, the 14 beautiful apartments have been completed and are now leasing! Pictures of these luxury apartments have been posted on this site, along with rental rates and the lease application. The decorative tile floor in the lobby and the elevator has been completed. We hope to have all our approvals by the end of April, and are projecting a move-in date for the apartments of May 1.

The automatic doors have been installed in the new Penn Herb Company store. The concrete floors have been polished, and soon the store fixtures will be installed. Keep checking back for updates!